The reconstruction of Federal Drive finished in July 2024.
Works included:
- Stabilisation of the land slip (soil nailing, tree removal, earthwork).
- Revegetation of the slip face.
- Reconstruction of the road.
- Drainage work including the replacement of four culverts.
- Repair and reseal of the road pavement.
- Installation of guardrails.