Left Bank Road repairs and drainage

  • Project value$1.58 million
gravel road with barriers on side of road and trucks in the background

From September to November 2023 major road and drainage work was done on sections of Left Bank Road:

  • 400-metre stretch of Left Bank Road west of Tuckeroo Avenue
  • Frasers Road to the end of Left Bank Road.

The project involved:

  • Heavy patching
  • pavement rehabilitation
  • drainage maintenance
  • installation of kerb and gutter
  • two drainage crossovers.  

Note:  this work is separate to the reconstruction of culverts, causeways, and drainage damaged in the floods.